PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed metal decking at the lower roof Facing South (800x600).jpg Laying out gravel at the Main Loby (102) Facing South (800x600).jpg Metal decking at Roof Facing West (800x600).jpg Started installing couplers at (2nd Floor) along column 7 between J-M Facing North (800x600).jpg Welded embed at the pour stop Facing West (800x600).jpg Welding the embeds at the pour stops along column line L between 5-3.3 Facing East (800x600).jpg
Previous pageNext page Welded embed at the pour stop Facing West (800x600)
Welded embed at the pour stop Facing West (800x600)